New Home Building Estimate example report

Below is an example report outline of some of the items included in our new home building estimate reports.

Category Qty Unit Labour Material Plant Subcontract Total
LABOUR RATES
Subcontract labour - estimated charge out rate - carpenter/joiner 0.000 h
Category Qty Unit Labour Material Plant Subcontract Total
LABOUR RATES
Subcontract labour – estimated charge out rate – carpenter/joiner 0.000 h          
Subcontract labour – estimated charge out rate – electrician – licensed 0.000 h          
Subcontract labour – estimated charge-out rate – plumber/gasfitter – licensed 0.000 h          
Subcontract labour – estimated charge out rate – painter 0.000 h          
Subcontract labour – estimated charge out rate – Labour unspecified – unskilled 0.000 h          
CAD drafting/design – per hour – average rate
CAD drafting / design – per hour – average rate 0.000 h          
Residential survey fees – single dwelling – mark boundaries and issue report – 5 corners 0.000 item          
Subcontract labour – estimated charge out rate – Labour unspecified – skilled Scaffolding – components – delivery + pickup – per hour 0.000 item          
Residential survey fees – single dwelling – survey – identification 0.000 item          
SITE PRELIMINARIES
Temporary – protective fencing hire – up to 30 metres – up to 6 months 0.000 m          
Temporary – protective fencing hire – over 30 metres – on going 0.000 m          
Temporary – handrail hire – per metre – delivery-erection-dismantling and pick up 0.000 m          
Subcontract labour – estimated charge out rate – Labour unspecified – skilled
Scaffolding – components – delivery + pickup – per hour
Temporary – protective fencing hire – over 30 metres – ongoing 0.000 m          
Temporary fence/handrail – galvanised steel posts – per week – 900mm
Scaffolding – components – tube galvanised steel – per week
Scaffolding – components – fitting galvanised steel – per week
Scaffolding – components – plank – per week
Temporary – roof perimeter handrail – per metre – 14-day hire 0.000 m          
Temporary – void protection – hire or 4 months – 20m2 0.000 job          
Scaffolding – hire fixed – weekly hire – 2-storey scaffold – 60m x 4.2m high 0.000 job          
Scaffolding – hire fixed – weekly hire – 2 storey scaffold – 60m x 4.2m high 0.000 week          
Scaffolding – mobile scaffold + setup – 4m high – minimum 1-week hire 0.000 week          
Building site sign – plywood – plywood – freestanding frame – 600 x 900mm 0.000 item          
Temporary – footpath crossing – timber – 3.6 metres wide x 4.0 metres long 0.000 item          
Subcontract labour – estimated charge out rate – Carpenter/Joiner
Mesh wire or stapping – straps – galvanised steel – 25mm wide x 1.2mm
Treated pine – H3 MGP10 – cost per metre – 140mm x 35mm
Termite pest management – stainless steel mesh – part protection – additional penetrations 0.000 m          
Termite pest management – stainless steel mesh – full protection – perimeter 0.000 no          
Water connection – connection to water supply – including meter – 40mm diameter 0.000 m          
Termite pest management – stainless steel mesh – part protection – penetrations; less than 10 0.000 job          
Temporary – power pole hire – hire per pole – single phase 0.000 item          
Temporary – electrical service connection – overhead – single phase 0.000 item          
Skip bin hire – general waste – light domestic & commercial – 4m3 0.000 item          
Domestic site cleaning – including bin – initial site clean 0.000 week          
Domestic site cleaning – including bin – interim or final site clean 0.000 item          
Domestic site cleaning – including bin – interim or final site clean 0.000 no          
Domestic site cleaning – internal house clean – large 0.000  no   

     
Subcontract labour – estimated charge out rate – Cleaner – technical 
Cleaning components – general – allowance – for cleaning accessories 
Cleaning components – general – per litre – industrial cleaner
PLANT HIRE- GENERAL
Equipment delivery and pick up – per item – minimum  0.000  item     
 
   
Tarpaulin – per week – 11m x 7.3m  0.000 week           
Toilet – single – chemical  0.000 week           
Prop / brace – single a crow – 1 day – hire  0.000  day           
Site shed – site office – 3.6m x 2.4m  0.000 week           
Site shed – lock up storage – 3.6m x 2.4m  0.000 week           
Mobile crane – per hour – 20 tonne  0.000           
EXCAVATION
Machine – remove 150mm tops oil and stockpile – machine – 500m2 0.000  m          
Loader – Track drott – 10 – 12 tonne – medium – bucket capacity 1.2 – 2 m3 
Float charges – large plant – float each way – 10 – 15 tonne
Machine – filling to make up levels – per m3 – sand  0.000  m          
Moisture barrier – taped joints – plastic membrane – 200um  0.000  m          
Machine – filling / bedding / compacting around pipes – 10mm blue metal & coarse sand – 150mm deep x 150mm wide x 75mm thick gravel 0.000           
Subcontract labour – estimated charge out rate – Labour unspecified – unskilled 
Filling sand – filling/bedding sand – per tonne 
Aggregate – blue metal 10mm – per tonne 
Plate compactor – petrol – medium 
Compact Excavator – 5-7 tonne –
CONCRETEIN-SITU
Concrete pump / operator – per each – minimum charge  0.000  no           
Footing beams/column bases/strip footings; concrete 20MPa; pump  0.000  m          
Concrete test – slump – per cone  0.000  no           
Slab on ground; concrete 20MPa; pump  0.000  m          
Slab on ground – concrete 20MPa – pump  0.000  m          
Suspended slabs / attached beams – concrete 25MPa – pump  0.000  m          
Concrete curing; compound; spray; PVA based  0.000  m          
Stairs / landings – concrete 25MPa – pump  0.000  m          
Subcontract labour – estimated charge out rate – Labour unspecified – skilled 
Ready mixed – concrete – per m3 – 25MPa 
Concrete pump – per m3 – quantity charge
Slab finish; steel trowel; power  0.000  m          
Slab finish – wooden float – per m2  0.000  m          
CONCRETEFORMWORK
Foam – waffle pods – polystyrene pod – 1m x 1m – 300mm thick  0.000  no           
Foam – waffle pods – plastic spacer – 2 way  0.000  no           
Foam – waffle pods – plastic spacer – 4 way  0.000  no           
Formwork – permanent- suspended sheet steel – galvanised – rib/tray – suspended soffit – 0.75mm thick 0.000  m          
Formwork – permanent- suspended sheet steel – galvanised – edge rib/tray – 100mm wide 0.000           
Class 5 footing formwork; beam sides; 200mm to 300mm high  0.000           
Formwork class 3 – suspended slab vertical edges – edges or other narrow width – 100mm to 200mm wide 0.000           
Formwork class 3 – staircase – stringer including stair profile – to 200mm wide  0.000           
Subcontract labour – estimated charge out rate – Carpenter/Joiner Release agent – per litre – formwork mould oil Formply – – 17mm thick Structural formwork – pine LVL supports – LVL – 95mm x 47mm Nails – gun – frame – galvanised finish
Formwork class 3 – staircase – risers – to 200mm high  0.000           
Subcontract labour – estimated charge out rate – Carpenter/Joiner 
Release agent – per litre – formwork mould oil 
Formply – – 17mm thick 
Nails – gun – frame – galvanised finish

 

Scroll to Top